Note from DoC
=============================================
Important notice to visitors
Deliverance Cove/Castlepoint
Track Extension
? Over the period 27 February to 17 March 2006 the Castlepoint Ratepayers Assn is carrying out the construction of a new track from the Lions Neck saddle to the beach.
? Parts of the existing track may be closed to the public at times.
? Machinery will be operating at the Church car park and along the beach in the basin at times.
? The public are advised to keep clear of the construction work and machinery at all times. The areas affected will be signposted and sealed off with warning tape.
For your safety, every effort has been made to ensure this information is correct. However, you should always seek more information before you begin your trip and be prepared to change your trip according to conditions.
For further information contact:
Derrick Field, Area Manager, Wairarapa Area Office
Ph: (06) 377 0700 or (027) 221 7166